Fast assemble prefabricated steel structure chicken poultry breeding house

FOB Reference Price:Get Latest Price
US $30-70 / Square Meters | 100 Square Meter/Square Meters (Min. Order)
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Shandong, China (Mainland)
Brand Name:
DFX
Model Number:
663
Material:
Steel
Use:
Carport, Hotel, House, Kiosk,Booth, Office, Sentry Box,Guard House, Shop, Toilet, Villa, Warehouse, Workshop,Plant
product:
steel structure chicken poultry house
material:
light steel frame
Grade:
Q235B, Q345B
Column and Beam:
hot rolled or welded H section, I section
surface processing:
painted or galvanized
roof & wall panel:
PU, EPS,rock wool/fiber glass sandwich panel
window and door:
PVC or aluminum alloy;sliding door or rool up door
service life:
more than 50 years
Drawing:
design the drawing as your demand
Installation:
Engineer helps to instruct installation
Supply Ability
Supply Ability:
60000 Square Meter/Square Meters per Month 2000 tons per month
Packaging & Delivery
Packaging Details
steel structure chicken poultry house :
Export package and flat packed into shipping container or as your requirement
Port
Qingdao Port , China
Lead Time :
Shipped in 35 days after payment

Fast assemble prefabricated steel structure chicken poultry breeding house

 

Product Description

Chicken egg poultry farm building for chicken farms 

We can provide the perfect design according to your demands!

 

Main component

Main steel frame

H section steel beam and columns, painted or galvanized, galvanized c section or steel pipe

Secondary frame

hot dip galvanized c purlin , steel bracing , tie bar , knee brace , edge cover etc.

Roof panel

EPS sandwich panel, glass wool sandwich panel, rock wool sandwich panel, and PU sandwich panel or steel sheet

Wall panel

sandwich panel or corrugated steel sheet

Tie rod

circular steel tube

Brace

round bar

Knee brace

angle steel

Roof gutter

color steel sheet

Rainspout

PVC pipe

Door

sliding sandwich panel door or rolling metal door

Windows

PVC/aluminum alloy window

Connecting

post feet bolts, intensive bolt , intensive bolt

Packing

according to the pack list made by our engineer

Drawing

we can make the design and quotation according to your require or your drawing

 

Product Pictures of  chicken egg poultry farm

 


 

You want a such chicken house? Please tell me more of your demands.

 

We have been in this line for more 10 years. With well professional trained workers, professional architects and engineers, better quality control and experienced international trade service team, our products enjoy great popularity in more than 40 countries.

Our factory is very near to Qingdao airport about 25-30 minutes by car.

 

Different Panels

 

Steel material

 

Advantages

a). Wide span: single span or multiple spans, the max span clear distance is 36m, without middle columns.

b). Low cost: unit price range from USD35 to USD70/square meter FOB according to customer's request. Fast construction and easy in installation

c). Long term service life: more than 50 years.

d). Other characteristics: environmental protection, stable structure, earthquake resistance, water proofing, and energy saving.

 

Workshop View And Production Line

 

Glad to tell you that we have joined the Trade Assurance on Alibaba to protect your payment to make sure that we deliver on time and manufacture quality products as required. More info about Alibaba Trade Assurance, please visit: tradeassurance.alibaba.com

 

 

Our Services

1.Design the building according to requirements

2.Produce every components of the building

3.Quality check

4.Loading containers and ship to destination port

 

We can provide the quotation, if you confirm the information as bellow:

*the size of the building or floor plan or your demands, the width, length and height.

*Wind speed (KM/H)

*Snow load (KG/m²)

*Rain load (KG/m²)

*Earthquake load if have

*Demands for doors and windows

 

 

Company Information

FAQ

1. How to buy your ideal products?

A: TT and L/C are acceptable and TT will be more appreciated. 50% deposit before producing, 50% balance before loading by TT.

2. What is the delivery time?

A: It depends on order quantities. Generally speaking, the delivery time will be within 15 to 40 days.

3. How to pack the products?

A: We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.

4. How to install after the goods arriving destination?

A: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.

 

Our other products, If you are interested in these building, please click the picture below!

 

 

 

Contact Us

Name

Tina Li

Email address

marketing(at)bigdirector.com.cn

Skype

Tina Li--Big Director Group

Whats app

+86 18724796703

QQ

52215722