Easy Assembly Prefab Steel Bolivia Metal Warehouse In China

FOB Reference Price:Get Latest Price
US $30-150 / Square Meter | 100 Square Meter/Square Meters Bolivia Metal Warehouse In China (Min. Order)
Supply Ability:
2000 Ton/Tons per Month Bolivia Metal Warehouse In China
Port:
Qingdao Port , China
Overview
Quick Details
Place of Origin:
Shandong, China (Mainland)
Brand Name:
DFX
Model Number:
low cost factory workshop steel building
Product Name:
Easy Assembly Prefab Steel Bolivia Metal Warehouse In China
Material:
Light Steel Frame
Application:
Light Weight Low Cost Steel Prefabricated House
Service Life:
More Than 50 Years
Alternative Choice:
Crane, Daylighting Band
Window and Door:
Pvc Or Aluminum Alloy;Sliding Door Or Rool Up Door
Character:
Construction Period Is Short, Easy To Install, Recyclable .
Roof & Wall Panel:
PU, EPS,Rock Wool/Fiber Glass Sandwich Panel
Workshops & Plants Color:
White, Blue, Red, Green, Etc
Workshops & Plants Surface Processing:
Painted Or Galvanized
Packaging & Delivery
Packaging Details
Easy Assembly Prefab Steel Bolivia Metal Warehouse In China :
naked loaded in shipping container or as your requests ; the specifications of shipping container have 20GP,40GP,40HP,40OT
Delivery Time
15-25 days after receiving prepayment

Easy Assembly Prefab Steel Bolivia Metal Warehouse In China

 

Product Description

 

Product Name

Easy Assembly Prefab Steel Bolivia Metal Warehouse In China

Main Steel Frame

H section steel beam and columns, painted or galvanized, galvanized c section or steel pipes.

Secondary Steel Frame

Hot dip galvanized c purlin, steel bracing, tie bar, knee brace, edge cover, etc.

Roof or Wall Panel

EPS sandwich panel, glass wool sandwich panel, rock wool sandwich panel, and PU sandwich panel or corrugated steel sheet.

Tie Rod

Circular steel tubes

Brace

Round bar

Knee Brace

Angle steel

Roof Gutter

Color steel sheet

Rain Downpipe

PVC pipe

Doors

sliding sandwich panel door or rolling metal door or vertical hinged door

Windows

PVC frame or aluminum alloy frame windows

Connecting

Post feet bolts, anchor bolts, intensive bolts and machine bolts

Packing

According to the pack list made by our engineer

Drawings

CAD drawings

Quotation

we can make the design and quotation according to your require or your drawing.

Finished Products

 

Related Products

If you are interested in them, please check the products below:

steel structure warehouseprefab house or modular housesteel frame airplane hangar

 

Advantages

1. Possess a wide span, with either a single or multiple spans and can have a maximum span clearance distance in 36m without middle columns.

2. Low cost with FOB unit price ranging from USD 30 to USD 80 per square meter according to customer's requirements.

3. The warehouses are also environmentally friendly, having a stable structure, are of earthquake resistance, water proof and energy saving.

4. Widely used as industry factory building, warehouse, gymnasium, poultry shed, school and medical clinic, garage, hangar, etc.

5. Fast construction and easy installation.

6. Has a service life of more than 50 years.

Production Flow

 

Click to check the video~~

 

Sandwich Panels

 

Need A Quotation? Please send us your drawings or please tell us the following information.

1) Location (where is the construction place? ) _____country/area

2) Size: Length*Width*Height  _____m*_____m*_____m

3) Wind load is ?(max. Wind speed) _____kn/m2 or_____km/h or_____m/s

4) Snow load is ? (max. Snow height) _____kn/m2 or_____mm

5) Brickwall needed or not? If yes, 1.2m high or 1.5m high?

6) Thermal insulation needed? If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; If not, the metal steel sheets will be ok. The cost of the latter will be much lower than the former.

7) Door quantity & size _____sets, _____(width)mm*_____(height)mm

8) Window quanity & size _____sets, _____(width)mm*_____(height)mm

9) Overhead Crane needed or not? If yes, _____sets, max. lifting weight____tons; Max. Lifting height _____m

 

Company Information

 

Our Customers

 

Verified Information

 

FAQ

1. What are the payment terms?

A: TT,  L/C and Trade Assurance are acceptable and TT will be more appreciated. 50% deposit before producing, balance before loading by TT.

2. What is the delivery time?

A: It depends on order quantities. Generally speaking, the delivery time will be within 15 to 35 days.

3. How to pack the products?

A: We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.

4. How to install after the goods arriving destination?

A: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation and wages will be paid by buyers.

 

Packaging & Shipping

 

Contact Us

 

Name

Tina Li

Email Address

marketing(at)bigdirector.com.cn

Skype

Tina Li--Big Director Group

WhatsApp

+86 18724796703

QQ

52215722