storage building construction steel cost of construction warehouse

FOB Reference Price:Get Latest Price
US $30-70 / Square Meter | 100 Square Meter/Square Meters storage steel building cost of construction warehouse (Min. Order)
Supply Ability:
80000 Square Meter/Square Meters per Month storage steel building cost of construction warehouse
Port:
Qingdao
Report Suspicious Activity
Overview
Quick Details
Standard:
AISI, ASTM, BS, DIN, GB, JIS
Grade:
light steel
Dimensions:
Different size available
Place of Origin:
Shandong, China (Mainland)
Brand Name:
Big Director
Model Number:
storage steel building cost of construction warehouse
Type:
Light
Application:
Steel Workshop
product name:
storage steel building cost of construction warehouse
business type:
manufacturer trading
certificates:
CE, ISO
service life:
about 50 years
steel structure:
light steel frame
Wall Panel:
EPS, PU, glass wool, rock wool sandwich panels
characteristics:
stable structure, earthquake resistance, water proofing, energy saving
advantages:
Fast construction and easy in installation
windows:
Aluminum alloy window or plastic steel windows
doors:
Sandwich board door or aluminum alloy door
Packaging & Delivery
Packaging Details
storage steel building cost of construction warehouse :
naked loaded in shipping container or as your requests ; the specifications of shipping container have 20GP,40GP,40HP,40OT
Delivery Time
35 days

storage building construction steel  cost of construction warehouse

 

Product Description

Steel structure building is a new type of building structure system. The main steel frame is formed by linking up H-section, Z-section and U-section steel components while roof and wall using a variety of sandwich panels.

 

Main component

Main steel frame

H section steel beam and columns, painted or galvanized, galvanized c section or steel pipe

Secondary frame

hot dip galvanized c purlin , steel bracing , tie bar , knee brace , edge cover etc.

Roof panel

EPS sandwich panel, glass wool sandwich panel, rock wool sandwich panel, and PU sandwich panel or steel sheet

Wall panel

sandwich panel or corrugated steel sheet

Tie rod

circular steel tube

Brace

round bar

Knee brace

angle steel

Roof gutter

color steel sheet

Rainspout

PVC pipe

Door

sliding sandwich panel door or rolling metal door

Windows

PVC/aluminum alloy window

Connecting

post feet bolts, intensive bolt , intensive bolt

Packing

according to the pack list made by our engineer

Drawing

we can make the design and quotation according to your require or your drawing

 

Product pictures

 

Characteristics:

1. Possesses a wide span, with either a single or multiple spans and can have a maximum span clearance distance in 36m without middle columns.

2. Low cost with unit price ranging from USD30 to USD 87 per square meter FOB according to customer's requirements.

3. Fast construction and easy installation

4. Has a service life of more than 50 years

5. The warehouses are also environmentally friendly, have a stable structure, are earthquake resistance, water proof, and energy saving

Product application:

Widely used as industry factory building, warehouse, gymnasium, poultry shed, school and medical clinic, garage, hangar, etc.

Production processing

 

Sandwich Panels

 

 

Main Materials:

1. Q235,Q345 H section steel structure for columns and beam

2. Pre-embedding anchor bolts for connection columns to foundation

3. Intensive bolts for connection between columns and beams.

4. Wall/roof panel: one layer corrugated steel plate or sandwich panels

5. Windows/door: PVC, aluminum alloy, steel etc.

6. Color steel plate or galvanized steel gutters and PVC tubes for rain water

 

Our other products, If you are interested in these building, please click the picture below!

 

 

Steel part

 

 

 

Packing and loading cotainer

 

FAQ

1. How to buy your idea products?

A: TT and L/C are acceptable and TT will be more appreciated. 50% deposit before producing, balance before loading by TT.

2. What is the delivery time?

A: It depends on order quantities. Generally speaking, the delivery time will be within 15 to 30 days.

3. How to pack the products?

A: We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.

4. How to install after the goods arriving destination?

A: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.

 

 

Prefabricated light steel structure industrial building workshop warehouse construction, please click button " send", we will give our best price !!!

Our service

1.

Design the building according to requirements

2.

Produce every components of the building

3.

Quality check

4.

Loading containers and ship to destination port

Name

Tina Li

Email address

marketing(at)bigdirector.com.cn

Skype

Tina Li--Big Director Group

Whats app

+86 18724796703

QQ

52215722